| 1. | Dock number three is long, wide and a depth below chart datum of.
|
| 2. | The chart datum varies according to the standard used by each national Hydrographic Office.
|
| 3. | Dock number four is long, wide and has a depth below chart datum of.
|
| 4. | Depths are measured from the chart datum, which is related to the local sea level.
|
| 5. | BREMERHAVEN Container Terminal's navigation channel will soon have a water depth of 14m below chart datum.
|
| 6. | These predictions are given in feet or meters, with respect to the chart datum for average meteorological conditions.
|
| 7. | The main navigation channel is dredged to below chart datum, and a depth of up to alongside the quay.
|
| 8. | Storm surge was significant in Hong Kong and the water level was 17'9 " above chart datum in some places.
|
| 9. | There are two berthing facilities 70 and 80 meters long respectively, with existing water depth of 6 meters below chart datum.
|
| 10. | The main navigation channel is dredged to 14.5 metres below chart datum, with a maximum depth of 15 metres alongside the quay.
|